Marina Bay Sands

Owner: Las Vegas Sands Corporation
Total Size: 9,096,000 SF square feet
Completion Date: 2011
Construction Cost: $5.7B

Project Team:
Design Architect: Safdie Architects
Executive Architect: Aedas, Pte, Ltd
Structural/Civil/Geotechnical/Acoustical Engineers: Arup
MEP Engineer (Design): R. G. Vanderweil, LLP
MEP Engineer (Production): Parsons Brinkerhoff
Employer: Arup

Mr. Dodge’s Roles: Primary structural designer for Crystal Pavilions through detailed design, 3D models of ArtScience Museum for concept design, concept design assessment of foundation loads for Casino, Arena, and Convention Center

Link to project’s wikipedia page:
https://en.wikipedia.org/wiki/Marina_Bay_Sands